Summary

Dan asked on ‣ whether Eden Fractal Projects should get one property per voting period ("Votes period 146", "Votes period 147", …) plus formulas for the four- and twelve-week averages. The recommendation is a separate Votes database instead, with one page per project per period, linked back to the project. Nothing has been built yet; this page is the advice.

Table of Contents

tracking-period-votes-eden-fractal.mp3

<aside> 🎧

Synthetic document narration · 3:27 · Local stock voice, not an original meeting recording. ‣ · ‣. Listening and perceptual fidelity are unconfirmed.

</aside>

Exact narration transcript:

project-period-votes-narration.md

<aside> ℹ️

Current navigation — November 13, 2026; not part of the preserved spoken edition. This processing run has been resolved as advice only; no Votes database or import was authorized. Future implementation belongs to ‣. The November 5th narration remains the historical draft edition; its pending-decision navigation is not a new request to reopen the completed umbrella decision.

</aside>

Why not one property per period

A property per period is easy to inspect initially, but continually adds columns and can make rolling-window maintenance cumbersome. A separate record per project-period is a design alternative, not a requirement decided in the meeting. Compare the options against the actual voting workflow before building either.

Recommended design

This is an unbuilt design proposal. A minimal project-period record could contain Project (relation), Period (number), Respect-weighted votes (number), source-result link (URL) and verification date. Projects would need a reciprocal relation plus any agreed summary calculations; they would not remain unchanged except for formulas.

Before implementing rolling four- and twelve-week summaries, settle these rules: