Dan asked on ‣ whether Eden Fractal Projects should get one property per voting period ("Votes period 146", "Votes period 147", …) plus formulas for the four- and twelve-week averages. The recommendation is a separate Votes database instead, with one page per project per period, linked back to the project. Nothing has been built yet; this page is the advice.
Table of Contents
tracking-period-votes-eden-fractal.mp3
<aside> 🎧
Synthetic document narration · 3:27 · Local stock voice, not an original meeting recording. ‣ · ‣. Listening and perceptual fidelity are unconfirmed.
</aside>
Exact narration transcript:
project-period-votes-narration.md
<aside> ℹ️
Current navigation — November 13, 2026; not part of the preserved spoken edition. This processing run has been resolved as advice only; no Votes database or import was authorized. Future implementation belongs to ‣. The November 5th narration remains the historical draft edition; its pending-decision navigation is not a new request to reopen the completed umbrella decision.
</aside>
A property per period is easy to inspect initially, but continually adds columns and can make rolling-window maintenance cumbersome. A separate record per project-period is a design alternative, not a requirement decided in the meeting. Compare the options against the actual voting workflow before building either.
This is an unbuilt design proposal. A minimal project-period record could contain Project (relation), Period (number), Respect-weighted votes (number), source-result link (URL) and verification date. Projects would need a reciprocal relation plus any agreed summary calculations; they would not remain unchanged except for formulas.
Before implementing rolling four- and twelve-week summaries, settle these rules: